About Stroyinject

Stroyinject was founded in 1960 and specializes in geotechnical engineering. In its existence of over 50 years the company has participated in the construction of all major civil and infrastructure projects in Bulgaria. Since 1999 Stroyinject is a private company and has expanded its size and operations significantly. Currently, the company takes part in major infrastructure projects such as: the metro construction in the city of Sofia, the strengthening and stabilization of excavation pits for big commercial centers and buildings in Bulgaria, as well as fortification of landslides in the Black Sea region. STROYINJECT specializes in civil and infrastructure projects: road, railroad facilities, hydro-technical facilities, bridge foundations and strengthening of excavation pits, landslides etc.


News

all news »

Opening of the railway bridge over Maritza River nearby Svilengrad

On the ninth of May 2013 the first completely finished railway project, that has been financed by the Operative program “Transport” – railway line "Svilengrad – Turkish border.".The project includes Railway Bridge full text »

Opening of the new barrages on Vacha River nearby the town of Krichim

On the ninth of May 2013 the new hydraulic barrages on the Vacha River nearby the pump station “Krichim - Ustina” were brought into service officially.Constructor of the facilities is “Stroyinject” JSC. The hydraul full text »

Projects

all projects »
Commercial Complex

Commercial Complex "MEGA MALL SOFIA" - Liulin Qr

Technical data: Excavation and disposal is 96 687 cubic meters

Period:

about the project »
BULGARIA MALL – MULTIFUNCTIONAL ENTERTAINMENT CENTER, Sofia, Bulgaria

BULGARIA MALL – MULTIFUNCTIONAL ENTERTAINMENT CENTER, Sofia, Bulgaria

Technical data: Excavation and disposal of 238 000 cubic meters of earth

Period:

about the project »
Commercial, entertaining and office complex “Hermes park - Sofia“

Commercial, entertaining and office complex “Hermes park - Sofia“

Technical data: Cast-in piles ø 600, H=10-14m, L=6500 m; IBO anchors R32, R38 mm, L=12 700 m; Volume of the excavation pit - 350 000 m3

Period:

about the project »