ØCurrent projects
Stabilization of landslides, excavations, foundation of buildings and installations
|
Project |
Technical data
|
Assignor |
Period |
Building of Second Metro Diameter of METRO SOFIA, LOT 2, Section Patriarh Evtimiy
Blvd. – Cherni Vrah Blvd. |
Length of the section – 2.6 km., 3 Metro stations, starting shaft for tunnel
in New Austrian Tunneling Method /NATM/, tunnel in New Austrian Tunneling Method
/NATM/ with length of 800 meters |
Metropoliten EAD |
2009 - 2011 |
|
Extension of METRO SOFIA – First Metro Diameter, section from Mladost 1 Qr. –
Metro station 13 to Tzarigradsko Shosse Blvd. – Metro station 19. |
Building of metro tunnel in top down method, by diaphragm wall constructions
– 410 meters.
Building of metro stations in top down method, by diaphragm wall constructions
– Metro station 18 and Metro station 19. |
Metropoliten EAD |
2009 - 2011 |
|
BULGARIA MALL – MULTIFUNCTIONAL ENTERTAINMENT CENTER, Sofia, Bulgaria |
Fortification by diaphragm walls and anchors, excavation and disposal of earth
from the construction site. The diaphragm walls are with 300x60 cm. size of the
single lamella and depth of 23 meters. IBO anchors R51 with 23 meters length are
used. Altogether length of the anchors for the construction site is 26 784 meters.
Excavation and disposal of 238 000 cubic meters of earth. |
Mercury EAD |
2008 - 2009 |
MULTIFUNCTIONAL TRADE AND ENTERTAINMENT COMPLEX WITH UNDERGROUND PARKS “EUROPE
CENTER SOFIA”, Sofia, Bulgaria |
Supporting of constructional excavation by anchored diaphragm walls. The size
of the single lamella of the diaphragm wall is 300x60 cm. and depth of 17 meters.
The volume of the diaphragm wall for the construction site is 12 100 sq. meters.
The anchors are IBO R51 type with single length of 20 meters and altogether for
the construction site 1420 meters. The volume of excavation and disposal is 555
537 cubic meters of earth. |
Europe Center Sofia LTD.
|
2008 - 2009 |
|
|
|
|
|
|
|
| | |
| | |
|
|
| | |
|
|